Parcel 0

Cadastral road parcel, formed from a part of the parcels c.p. 2/1 defined through the parcellation plan; surface: 2805.97 m²

Parcel 1

New construction parcel, formed from the parcel c.p. no. 2/1, and defined by the parcellation plan; surface: 24.500.0 m².
Parcel 1 – Shopping mall with warehouses
surface GDCS = 610 + 3837 + 2567 + 158 + 48 = 7220 m², the existing facilities in the parcel.
Floor L + 0, with partial floor.
Everything as a whole total 7220 m²
GROSS DEVELOPED CONSTRUCTION SURFACE EQUALS
Building quotient: facilities 7220 m²
Total: 7220 m²
7220/24500 = 0.29
Allowed quotient for industrial facilities equals max 1.5
DEGREE OF LAND EXPLOITATION
7220/24500 X 100 = 29.47 %
Max degree of exploitation equals 60 % for industrial facilities.
Facilities’ heights concerning their distance from the nearest surrounding facilities do not endanger the neighbours.
Conceptual gabarit can be adjusted in the main project to the technological requirements with the retaining of the facilities designation, flooring, construction line and the allowed GDCS deviation of up to 5 %

Parcel 2

New construction parcel, part of the c.p. 2/1, and defined by the parcellation plan; surface: 11.200.0 m².
Parcel 2 – Shopping mall with warehouses
surface GDCS = 682 + 109 m², the existing facilities on the parcel, new 2290 m². Floor L + 0, Everything as a whole total 3080 m²
GROSS DEVELOPED CONSTRUCTION SURFACE EQUALS
Building quotient:
facilities 3080 m²
Total: 3080 m²
3080/11200 = 0.275

Allowed quotient for industrial facilities equals max 1.5
DEGREE OF LAND EXPLOITATION
3080/11200 X 100 = 27.50 %
Max degree of exploitation equals 60 % for industrial facilities.
Facilities’ heights concerning their distance from the nearest surrounding facilities do not endanger the neighbours.

Parcel 3

New construction parcel, formed from parcels 15/2, 16/1, 16/2, 17/1, 17/2, 23/1 and a part of parcels 10/4, 10/1, and defined by the parcellation plan; surface: 22.400.0 m²
Parcel 3 – Shopping mall with warehouses
surface GDCS = 5378 + 223 + 351 + 350 m², existing facilities in the parcel
Floor L + 0, with partial floor
Everything as a whole total 6302 m²
GROSS DEVELOPED CONSTRUCTION SURFACE EQUALS
Building quotient:
facilities 6302 m²
Total: 6302 m²
6302/22400 = 0.2813

Allowed quotient for industrial facilities equals max 1.5
DEGREE OF LAND EXPLOITATION
6302/22400 X 100 = 28.13 %
Max degree of exploitation equals 60 % for industrial facilities.
Facilities’ heights concerning their distance from the nearest surrounding facilities do not endanger the neighbours.

Parcel 3a

Existing construction parcel, 23/1, and defined by the parcellation plan; surface: 3260.57 m²

Parcel 4 – new construction parcel, formed from parcels c.p. 10/2 and parts of parcels 2/1, 14/1, 14/3, and defined by the parcellation plan; surface: 14.900.0 m²
Parcel 4 – Shopping mall with warehouses
surface GDCS = 1318 + 4023 = 5341 m², existing facilities on the parcel
Floor L + 0
Everything as a whole total 5341 m²
GROSS DEVELOPED CONSTRUCTION SURFACE EQUALS
Building quotient:
facilities 5341 m²
Total: 6302 m²
5341/14900 X 100 = 35.84 %
Max degree of exploitation equals 60 % for industrial facilities.
Facilities’ heights concerning their distance from the nearest surrounding facilities do not endanger the neighbours.

Parcel 4a

Cadastral road parcel, formed from a part of parcel 14/1, and defined by the parcellation plan; surface: 1673.27 m².

Parcel 5

New construction parcel, formed from a part of parcel c.p. 8/1, and defined by the parcellation plan; surface: 16.100.0 m².
Parcel 5 – Shopping mall with warehouses
surface GDCS = 343 + 685 + 953 + 98 + 143 + 229 = 2451 m², existing facilities on the parcel, new 1865
Floor L + 0
Everything as a whole total 4361 m²
GROSS DEVELOPED CONSTRUCTION SURFACE EQUALS
Building quotient:
facilities 5341 m²
Total: 6302 m²
5341/ 16100 = 0.33
Allowed quotient for industrial facilities equals max 1.5
DEGREE OF LAND EXPLOITATION
5341/16100 X 100 = 33.17 %
Max degree of exploitation equals 60 % for industrial facilities.
Facilities’ heights concerning their distance from the nearest surrounding facilities do not endanger the neighbours.

Parcel 6

New construction parcel, formed from parts of parcels c.p. 7/1, 8/1, and defined by the parcellation plan; surface 7300.0 m².
Parcel 6 – Shopping mall with warehouses
surface GCDS = 1476 m², new facility
Floor L + 0, partial floor
Everything as a whole total 4316 m²
GROSS DEVELOPED CONSTRUCTION SURFACE EQUALS
Building quotient:
facilities 1476 m²
Total: 1476 m²
1476/7300 = 0.20
Allowed quotient for industrial facilities equals max 1.5
DEGREE OF LAND EXPLOITATION
2214/7300 X 100 = 30.33 %
Max degree of exploitation equals 60 % for industrial facilities.
Facilities’ heights concerning their distance from the nearest surrounding facilities do not endanger the neighbours.

Parcel 8

New construction parcel, formed from parts of parcels c.p. 5/3, 8/2 and 2/1, and defined by the parcellation plan; surface 5334.11 m².
Parcel 8 – new construction parcel for the gas station.

Parcel 9

Ccadastral road parcel, formed from parts of parcels c.p. 5/3 and 2/1, defined by the parcellation plan; surface: 1714.65 m².

Parcel 11

New construction parcel, formed from parts of parcels c.p. 2/4, 54/13; surface: 1694 m².
Parcel 11 – new construction parcel for the gas station
 

Graditelj HOLDING AD Beograd
Francuska br.24 Serbia
+381 11 334-6672 +381 11  334 6671
email: graditeljgm@eunet.yu

 
Design by Oglasi 032 hosting by Gradac.Net